Development History
2022 year
On February 18th, the industry’s first large-scale 6T electro-hydraulic hammer was installed in Workshop 5C. This enabled the company to extend its production process to the manufacturing of round steel bars. Working in synergy with it, the supporting 3T electro-hydraulic hammer allowed the company to bid farewell to the history of relying on external collaboration for the processing of large and extra-large drill blank, and also marked a significant step forward in the company’s R&D and production of mid-to-high-end drill tools.Happy events came one after another. The second phase of the expanded comprehensive building was completed and put into full use, greatly improving the company’s office, accommodation, dining, parking facilities and humanistic environment. The company is becoming more beautiful, and the business is thriving day by day. The second new factory building of “Xinyanggang” was converted into a heavy drill rod workshop. On August 6th, the first batch of products from the heavy drill rod production workshop came off the production line and was officially put on the market.Up to now, “Xinjinguang Company” has obtained nearly 20 various technical patents and won dozens of honorary titles such as “National High-Tech Enterprise”, “Hunan Provincial New Material Enterprise”, “China Little Giant Enterprise” and “Hunan Provincial Enterprise Technology Center”. Despite the current uncertain market environment, the company is forging ahead with determination, making continuous explorations, and striding forward towards a more promising future!
2021 year
By the end of June, the wholly-owned subsidiary of “Maige” (note: if there is an official English name for “maige”, it is recommended to use the official one; the pinyin is used here for reference) actively responded to the government’s “cage exchange for birds” initiative (a policy aimed at optimizing industrial structure by phasing out outdated industries and introducing emerging/high-quality ones) thanks to the excellent business environment and strong support from the park government. It acquired another 88-mu (1 mu ≈ 0.0667 hectares, so 88 mu ≈ 5.87 hectares) of idle assets in the park through investment promotion, further establishing its presence in Pingjiang High-Tech Industrial Development Zone
2020 year
Workshops No. 11 and No. 12 were fully completed and put into use in June. To address the urgent demand for accommodation, dining, parking, and office spaces caused by the rapid growth of the employee population, on October 18th, the company officially broke ground for the construction of a new comprehensive building as part of its planning. This 9-story building, with a total area of 15,500 square meters and equipped with elevators, will integrate underground parking lots, a canteen, offices, and dormitories into one single structure
2019 year
Maige Machinery made its debut at bauma Germany. Bauma 2019, the world-renowned grand event in the construction machinery industry, grandly opened in Munich, Germany. As a professional manufacturer of down-the-hole (DTH) drilling tools, the company participated in the exhibition with 5 models of DTH drill bits independently developed by itself; during the one-week exhibition, it showcased the company’s achievements in production, manufacturing, development and innovation to 600,000 professional visitors, demonstrating the strength of “Made in China” to the world.
2018 year
Maige completed the second-phase expansion with high speed and high quality. After the successful expansion, the company’s total floor area reaches approximately 110,000 square meters, including 10 high-standard workshops, 2 staff dormitory buildings, 1 office building, 1 staff canteen, 1 worker cultural and sports center, and 1 expert building. At the same time, Maige has strengthened in-depth cooperation with scientific research institutions, achieving a significant improvement in industrial scale.
2017 year
Maige launched another phase of expansion for its second phase, purchasing nearly 100 mu (1 mu ≈ 0.0667 hectares, so nearly 100 mu ≈ 6.67 hectares) of land, constructing five high-standard workshops, one expert building and one worker cultural and sports center, while introducing a large number of supporting equipment.
2015 year
“Suba” series, an independent sub-brand developed with dedicated in-house R&D by Maige, became an instant hit and emerged as a market favorite
2014 year
Maige has expanded its R&D base and established a modern management team.
2013 year
Hunan Maige completed the first-phase project in Pingjiang Industrial Park, Yueyang, where a high-tech industrial base covering an area of 55,000 square meters was built. The company’s headquarters and production base were relocated to Pingjiang, Yueyang, and renamed “Zhuzhou Maige Construction Machinery Co., Ltd.”
2011 - 2012 year
Maige has rooted itself in Loudi, laying a solid foundation for its development.